Solar Water Heater

Installation Service Fee

  • ½ in. or ¾ in. Copper Pipe
    20 ft
  • ½ in. or ¾ in. Gate Valve
    x 2
  • ½ in. or ¾ in. Copper Accessory
    x 2
  • 4mm (or thinner) Power Cord
    10 ft
  • Soft Plastic Pipe
    10 ft
  • Time Switch
    x 1
  • ¾ in. Pressure Valve
    x 1
  • Remark: The on-site measurement fee is $300. It will be refunded for installation fee.
  • ½ in. or ¾ in. Copper Pipe
    20 ft
  • ½ in. or ¾ in. Gate Valve
    x 2
  • ½ in. or ¾ in. Copper Accessory
    x 2
  • 4mm (or thinner) Power Cord
    10 ft
  • Soft Plastic Pipe
    10 ft
  • Time Switch
    x 1
  • ¾ in. Pressure Valve
    x 1
  • Remark: The on-site measurement fee is $300. It will be refunded for installation fee.

Additional Charges

Regional / Walk‐up Surcharge
Delivery to Airport/Lantau Island/New Territories Remote Areas/Outlying Islands/ Tung Chung/Ma Wan
To be quoted
For buildings with no elevator, there will be an additional delivery charge
To be quoted
If the area cannot be reached by vehicles directly
(the distance between the parking area and the building entrance is 400m or above), and the products need to be delivered by bare hands or by trolley, there will be an additional delivery charge
To be quoted
^ 8 staircase steps = 1 floor
Materials without Installation Service
Standard Galvanized Iron Frame
Solahart 181LCSC24 $2,500/set
Solahart 302LCSC36 $3,000/set
Circulation Pump $3,200/set
Extra Installation Fee
Standard Galvanized Iron Frame with Installation
Solahart 181LCSC24 $3,500/set
Solahart 302LCSC36 $4,000/set
Non-Standard Iron Frame
To be quoted
Circulation Pump with Installation
$4,800
Crane Delivery
To be quoted
Special Service Fee
Surcharge for On-site Parking
Full Reimbursement for Actual Parking Fee^
^ If customer will provide free parking space, technician must be notified in advance

Remark

  • Separate quotation is required for other additional work not mentioned above
  • Additional work is to be paid by customer and completed by technician on the same day
  • Additional work to be commenced on a different day will require separate quotation
  • Quotation for additional work will be provided by technician on site